Projects

Sl.No Name of Client Name of the Work

Completed value of the Work

(Rs. in lakhs)

1.

Odisha Construction Corporation Ltd.

Unit- VIII,Gopabandhunagar,

Bhubaneswar - 751012

Sectioning of Makara River and Garanimunha Branch 961.02
2.

West Bengal Fisheries Corporation  Ltd

31, G.N Block, Sector-V, Salt Lake City,

Kolkata – 700091.

Renovation of Dal Gangli Beel

at Lalgola, Murshidabad

522.03
3.

Irrigation & Waterways Directorate

Metropolitan Drainage Division No. II

Jalasampad Bhawan,7th Floor

Salt Lake City, Kolkata – 700091

Re-Excavation  of  Upper

Bagjola Khal from 4907 m to

9235 m (by means of Pontoon mounted excavator )

71.13
4

Mackintosh Burn Limited

DD-18/8,Sector-1,Salt Lake City ,

Kolkata - 700064

Re-Sectioning of River Ichamati

at Gaighata and Swarupnagar

544.98
5

Nuclear Power Corporation of India Ltd.

Tarapur  Atomic Power Station.

Tarapur,Maharashtra-401504

Dredging/desilting of Intake Channel, Branch Channel, Fore Bays and CCW/ASW & SW Pump Houses at TAPS-3&4 134.60
6

Nuclear Power Corporation of India Ltd.

Tarapur  Atomic Power Station.

Tarapur,Maharashtra-401504

Dredging/desilting of Intake Channel, Branch Channel, Fore Bays and CCW/ASW & SW Pump Houses at TAPS-3&4 237.25
7

Mackintosh Burn Limited

DD-18/8,Sector-1,Salt Lake City ,

Kolkata - 700064

Desilting of River Ichamati from

Barnabaria  at 120 KM  to  BSF

Bridge  at Kalanchi

801.18
8

Water Resources Department

Govt. of Bihar, Champaran Division,

Motihari, Bihar.

Capital Dredging of The Pilot            Channel  of  River Gandok at         Motihari 846.20
9

Odisha Construction Corporation Ltd.

Unit- VIII,Gopabandhunagar,

Bhubaneswar - 751012

Sectioning of River Daya

from Bell mouth to Chilika

Dredging channel

576.78
10

Government of Odisha

Department of Water Resources

Office of the Chief Engineer,

Drainage,Gandarpur,Cuttack-753003

Dredging of Dakhina Nallah 181.09
11

Odisha Construction Corporation Ltd.

Unit- VIII,Gopabandhunagar,

Bhubaneswar - 751012

Sectioning of Jagadala Nallah 181.09
12

Directorate of Ports & Inland Water

Transport,Paribahan Bhawan (2nd Floor)

A.G.Square, Unit-II,Ashok Nagar, Bhubaneswar -9

Dredging of Satapada Jetty

Periphery in Puri District

218.08
13

NTPC Limited

Talcher Super Thermal Power Station

P.O-Deepshikha,Angul-759147,Odisha

Removal of Ash deposit by Dredging from Overfflow Lagoon (OFL) at stage-II ash dyke at Talcher , Kaniha 226.1
14

NTPC Limited

Talcher Super Thermal Power Station

P.O-Deepshikha,Angul-759147,Odisha

Removal of ash deposit at mouth of 1200 mm dia AWRS inlet pipe by dredging from Stage-II Overflow Lagoon 65.6
15

NTPC Limited

Talcher Super Thermal Power Station

P.O-Deepshikha,Angul-759147,Odisha

Dredging of ash from Over Flow Lagoon of Stage-II ash dyke 225.0
16

NTPC Limited

Talcher Super Thermal Power Station

P.O-Deepshikha,Angul-759147,Odisha

Removal ash deposit by dredging from Stage-II Overflow Lagoon 98.4
17

NTPC Limited

Talcher Super Thermal Power Station

P.O-Deepshikha,Angul-759147,Odisha

Dredging of ash from Over Flow Lagoon of Stage-II ash dyke 332
18

Directorate of Ports & Inland Water

Transport,Parbahan Bhawan(2nd Floor) A.G.Square,Unit-II,Ashok Nagar,

Bhubaneswar-9

Dredging of Basin to IWT Jetty

At Balugaon in Khurda District

179.1
19

NTPC Limited

Talcher Super Thermal Power Station

P.O-Deepshikha,Angul-759147,Odisha

Dredging of ash from Overflow Lagoon of Stage-II ash dyke at NTPC Kaniha 324
20

NTPC Limited

Barh Super Thermal Power Project

P.O-Barh, Bihar-803213,Patna

Dredging in River Ganga Near Intake Well at Barh STPP 247.2
21

Chattisgarh State Power Generation

Company Limited Korba(W)

Chattisgarh-495450

Dredging of silt sand etc. of Intake canal including allied works at HTPS,CSPGCL,Korba West 131.99
22

Govt. of Bihar

Water Resources Department

Valmikinagar

Maintenance Dredging for Pre & Post flood 2019 in the U/S of Gandak Barrage at Valmikinagar 464.22
23

Chief Executive

Chilika Development Authority

Odisha, Bhubaneswar

Dredging and Desilting work

Inside the Chilika Lake by using Cutter Suctgion Dredger

1070.14
24

Odisha Construction Corporation Ltd

Gopabandhunagar,Unit-B,

Bhubaneswar-751012

Renovation to Jagdal Nallah from RD 00 Km to RD 5.20 Km 1026.77
25

Odisha Construction Corporation Ltd

Gopabandhunagar,Unit-B,

Bhubaneswar-751012

Dredging of Jatadhari Muhan 414.63
26

Odisha Construction Corporation Ltd

Gopabandhunagar,Unit-B,

Bhubaneswar-751012

Improvement along with Dredging of old Alaka Drainage cut from RD 00 km to RD 7.00 km including 2 VRBs under DIP 500.56
27

Odisha Construction Corporation Ltd

Gopabandhunagar,Unit-B,

Bhubaneswar-751012

Dredging of Mugura Nallah from RD 8.160 Km to 12.840 Km 1080.10